Preventive maintenance programs

Make recurring work visible before, during, and after the Due Date.

A preventive-maintenance program is more than a list of frequencies. REQQER connects the recurring definition, advance planning, each individual work occurrence, forms and documentation, corrective follow-up, and management review.

Each recurrence becomes a separate Scheduled Task Req, so one overdue occurrence does not erase or stop the future program.

REQQER Scheduled Tasks Calendar showing current, late, completed, and future recurring work

Program lifecycle

Plan the responsibility once. Keep every occurrence accountable.

The recurring definition carries the instructions forward while each generated Scheduled Task becomes its own operational record.

DefineFrequency · Next Date · assignment · form
PlanPrior Days Notice · future calendar visibility
PerformSeparate Req · Activity · Work Duration
DocumentForms · uploads · vendor records
ReviewDashboards · Task Logs · Log Books

Build the recurring program

Keep the operating instructions with the recurring responsibility.

A Scheduler definition can carry Location, Item, Req Type, Priority, description, assignment, External Vendor, an electronic form, Asset, supporting documents, and documentation requirements along with its recurrence settings.

  • Frequency can be expressed in days, weeks, months, or years
  • Next Date identifies the Due Date of the next occurrence
  • Prior Days Notice creates the Req before the Due Date when planning time is needed
  • Weekend, holiday, and End Date rules can influence future dates
Explore the Scheduler Product Page
REQQER Scheduler Scheduling tab
REQQER Scheduled Tasks Calendar

Plan before the Due Date

See future recurring workload before every Req has generated.

The Scheduled Tasks Calendar can show future placeholders for recurring occurrences that have not yet generated, alongside work that is Open, Late, or Completed. That gives Maintenance Directors a way to balance the month before deadlines arrive.

  • Not Yet Generated placeholders show upcoming responsibilities
  • Open work remains visible before its Due Date
  • Late work remains visible after the Due Date
  • Completed work closes the loop without changing the future recurring program

Execution and evidence

Do not separate the preventive task from the proof that it happened.

Forms, Activity, Work Duration, photographs, vendor reports, and required uploads can be captured as part of the Scheduled Task instead of assembled later.

F

Structured inspections

Attach an electronic form so each occurrence carries the same checklist, readings, acknowledgements, and required responses.

Corrective follow-up

Configured form findings can create a separate corrective child Req while preserving the link to the inspection that found the problem.

D

Supporting documentation

Keep external reports, certifications, photographs, and other supporting files with the work and require an upload when appropriate.

Turn the program into management evidence

Use the records created during preventive work instead of rebuilding them later.

Anonymized REQQER Task Log showing recurring generator readings and signoff
REQQER Log Book Index page

Task Logs

Turn selected recurring electronic-form responses into a running date-based operational log where blank or partial entries remain visible.

Explore Task Logs

Log Books

Assemble selected Scheduled Task records, forms, and supporting documents into an indexed evidence package for easier reviewer access.

Explore Log Books

Capabilities behind the solution

A stronger PM program connects scheduling, field work, documentation, and oversight.

Map your recurring program

See how existing preventive-maintenance responsibilities would translate into REQQER.

A demonstration can focus on scheduling, workload planning, forms, documentation requirements, corrective action, Task Logs, Log Books, or multi-facility oversight.